Confirm what is being delivered

Keep the agreed equipment schedule and the supplied-model documentation together. Confirm the configuration, accessories and any separate stands or supports. A family photograph or a similar model is not enough to establish the space or connections your equipment needs.

Use the approved installation information for the actual unit. If the site plan and the equipment documents disagree, ask the project team to resolve the difference before delivery.

Walk the delivery route

Start at the unloading point and follow the route into the equipment's final position. Record door openings, corridors, stairs, lifts and turns. Share photographs of restrictions with the delivery team.

Agree who will provide access and who will coordinate with the building or fit-out contractor. Ask the delivery team to confirm the handling arrangements for the unit and its packaging.

Coordinate the site services

Give the responsible contractors the approved equipment requirements. Ask them to confirm the readiness of the relevant electrical, gas, water, drainage and ventilation services. Connection work should be carried out by the appropriate qualified personnel.

Keep the confirmation with the project documents. General catalogue information can help with early planning; the supplied unit's documentation and approved site design should guide installation.

Agree the handover

Before installation, agree who will attend testing and operator training. Ask which checks and records will be included in the handover, and keep the manuals, serial numbers and service contact together.

If part of the site is unfinished, tell the installation team before the visit. Share the outstanding work and proposed dates so the delivery and installation plan can be coordinated.